We're having fun!
Sunday, December 30, 2012
Monday, December 24, 2012
Merry Xmas
Yes, we got plastered. Well, our walls did.
Yes. we moved in. Yes, we had "real" movers. And help and support from much family and many friends.
Yes, it's taking me too long to post pics.
But for now, Merry Christmas to those who celebrate, secularly or otherwise.
And to Book-face, good night.
Posted by Adamooo at 12/24/2012 09:45:00 PM 0 comments
Tuesday, December 18, 2012
Sunday, December 16, 2012
Backing it up
Moving to the back of the room...
I'll share some more pics soon, but following from the Friday/Saturday work of tearing out and rebuilding the subfloor in the front of the new living room, we basically rebuild the framing of the rear corner today, after some head-scratching to find a balance between a _flat_ floor, a _level_ floor, and a floor that meets the rear wall at nearly the same distance from the ceiling as up in the front of the room. However, you can't (we decided, due to physics) have everything, so we selected our compromises and actually I think it will turn out really well.
In case I haven't described it well yet, we're reworking some of the joists where needed, adding support and digging away dirt that's too near to the wood. Then we're hanging two-inch, high-R-value rigid foam insulation flush to the surface, and laying OSB/plywood subfloors. Should have the majority of the room finished tomorrow and fairly flat (plus very solid). Then, a little space as we're hoping to have wallboard hung and plaster applied in the middle of the week!
Posted by Adamooo at 12/16/2012 09:19:00 PM 0 comments
Saturday, December 15, 2012
Building it up
Quick shots ... Rebuilding floor in the front section. We actually got through pretty much all of the ex-living room area. More floor tomorrow!
In this shot you see the 2" insulation we're putting underneath and the OSB going down for subfloor...
Posted by Adamooo at 12/15/2012 11:28:00 PM 0 comments
Wednesday, December 12, 2012
Foaming (at the mouth?)
OK, OK, long time no post. We've been working hard, at home and in the office. On the bright side, we're starting to see the fruits of our labors on the house front.
Sooo much has happened since Thanksgiving! We've torn out additional plaster (every time you think you're done...), put up an LVL beam across the rear of the new living room, worked on the back corner where the foundation is sinking away from the sills, and pulled out the floor in the rear area. The electricians did a couple days of rough installation for outlets, sconces, switches, and a ceiling can. Oh, and we installed radiant heat tubing in the ceilings under the bath and two bedrooms exposed in the working room! But more on those later - most recent photos come after having closed-cell foam insulation blown into the walls and ceiling, as well as around the sills to air-seal the crawlspace underneath. Rob and I pulled two or three extra-long days over the weekend to make this happen in time for the foam spraying Monday . . . thanks Rob!
It's nice to be substantially building in instead of tearing out!
Posted by Adamooo at 12/12/2012 05:16:00 PM 0 comments
Monday, November 26, 2012
Pics from the Valley
Here are some pics to go with the previous post...
Posted by Adamooo at 11/26/2012 11:54:00 PM 0 comments
In the Valley?
Well - another week gone by, and what have we got to show for it? Lots, actually.
In addition to really nice Thanksgiving meals and company, I am hoping we're basically done on the downhill of "tearing out", and ready to start going back upwards on "building in". With big help from Rob and Sybille, we've got the chimney removed, and the center-hall-blocking closet knocked out, as well as the closet in the back of the ex-Library. We've stripped down all the plaster that's going away, as well as the rest of the miscellaneous firring, hanger-boards, lath, obsolete disconnected electrical wiring, and other junk that doesn't need to be there. In short, we've got a ~14x25 space one direction, with another ~10x12 around the "L", and a substantial hallway re-opened from the end of the "L" to the front Entry. We've consulted with a Structural Engineer, done our own pondering and head-scratching, and talked to an electrician about wiring plans. So like I said, hopefully we can ADD something soon ;-).
Posted by Adamooo at 11/26/2012 11:21:00 PM 0 comments
Monday, November 19, 2012
That's Torn It ... Out!
So the wrecking derby continued this weekend - enough so that I haven't had time for detailed posts. This seems to have grown into the big dump of pics and details across three day's work.
We got a dumpster (10-cubic-yards) and filled 2/3rds of it with the Living Room and Library ceilings, the partition wall and built-in shelves/desk between the two rooms, and a three-by-eight or so section of flooring out of the back corner (pulled up to get a look at the sagging support structure).
Remaining work items include getting odds-and-ends demolition done as well as stripping plaster from the rear and side walls to insulate as we found nothing in there, and demolish the plaster and minor framing that walls in a closet in what used to be the center-hall . Oh, and tear up the floor in at least the rest of the Library part, probably the Living Room too to get a consistent floor level.
Some pics for your enjoyment and edification...
Posted by Adamooo at 11/19/2012 11:50:00 AM 0 comments
Pinky Redux
OK, the color isn't actually named "Pinky" this time, but with help from a friend (Thanks Kiera!) Christi got a full coat of paint into Margot's room yesterday. I'll post more pics after the second coat is on and the room cleaned up, but (excusing the flash-photography) here's a taste of the main (lighter) and accent colors (one wall, darker)...
Posted by Adamooo at 11/19/2012 09:58:00 AM 0 comments
Friday, November 16, 2012
More of Less
In brief, we took away a lot of the library and living room over the last couple of days. Now soon, but wanted to share the headline pics ASAP...
Posted by Adamooo at 11/16/2012 09:17:00 PM 0 comments
Wednesday, November 14, 2012
Big Demo
Rob arrived today and we got down to serious demolition. Don't have time to post it all, but big progress with the bulk of the Library "builtin" shelves gone, as well as probably 1/2 of the library ceiling, exposing much more detail about the framing and how it changes through the spaces. Found some scary knob-and-tube wiring but it turned out to be cut and disconnected a couple feet further on (phew). Failed to find any clear reason for the water stains on the plaster ceiling, though. We did expose the whole bottom of the tub area, so we can check that out easily. Also found where there used to be a vertical post that's not there anymore . . . hmm.
Demolished builtins and ceiling . . . the room now ~2 feet wider (and the leftmost part of that wall will go away soon)...
Scrap/leftovers from the builtins...
Trash pile... dumpster comes tomorrow...
Posted by Adamooo at 11/14/2012 09:57:00 PM 1 comments